Accelerating the deployment of next-generation long-duration energy storage

42T worked with RheEnergise to scale production of its proprietary high-density fluid and deliver the manufacturing system required to commission the company’s first-of-its-kind 500 kW Technology Readiness Level 7 (TRL 7) demonstrator plant.

Key outcomes

The challenge

RheEnergise has developed a new form of long-duration energy storage (LDES) that uses a high-density working fluid to deliver the benefits of pumped hydro with significantly lower elevation requirements. This removes many of the geographical constraints associated with conventional pumped storage, opening a much larger range of potential sites and enabling installations at a smaller, more distributed scale.

To commission its first grid-scale demonstrator, RheEnergise needed to scale the manufacture of its proprietary fluid from around 0.5 tonnes produced in total during development to a reliable operational process capable of producing 5 tonnes per day. Throughout this scale-up, product quality, process reliability and operational safety had to be maintained.

42T’s solution

42T designed and delivered the fluid-production capability required to support the commissioning of RheEnergise’s 500 kW demonstrator.

Using a risk-based engineering approach, the team identified the key technical challenges associated with scaling fluid manufacture from laboratory production to operational deployment. 42T then developed the process design, manufacturing strategy and implementation plan, drawing on expertise in fluid systems, manufacturing innovation, automation and process engineering.

42T delivered the design and specification of a large-scale fluid-mixing plant, complete with a semi-automated control system incorporating process automation, safety systems and an intuitive operator interface. By combining bespoke engineering with carefully selected off-the-shelf technologies, 42T delivered a practical, cost-effective production system designed for safe, reliable and repeatable operation by non-specialist personnel.

By taking ownership of fluid-production scale-up, process design and automation, 42T provided RheEnergise with the production capability required for commissioning while helping maintain progress against an ambitious eight-month delivery timeline.

Commissioning our 500 kW demonstrator is a major step in proving our unique approach as a practical LDES solution. 42T’s process design and automation experience has been vital in getting us to this point, and validating our fluid-production method under real-world conditions. As grids move towards 100% renewables, dependable long-duration storage like this will be essential.”

Why 42T

Meet the team

Peter Brown

Peter Brown

Chief Commercial Officer (CCO)

Peter leads business development and strategy across 42T’s innovation and product development programmes, combining deep technical expertise with strong commercial insight.

Ellie-Leigh

Ellie Leigh

Senior Consultant

Ellie supports multidisciplinary innovation and product development, combining structured innovation techniques with hands-on engineering experience across healthcare and renewable energy.

Read more

42 Technology supports launch of RheEnergise’s first-of-a-kind 500 kW energy-storage project

42 Technology supports launch of RheEnergise’s first-of-a-kind 500 kW energy-storage project

42 Technology has played a key role in helping RheEnergise successfully launch its high-density hydro…

How to combine machine vision with a digital twin and SLM for industrial process control

The bottleneck in automated industrial inspection is rarely data collection. Convolutional neural network (CNN)-based machine…

Fast-tracking scalable Edge AI solutions for global manufacturers

42 Technology has announced a strategic partnership with Synaptics, a leader in Edge AI processors,…

Let us help you

We excel in deep innovation and technical breakthroughs, from early-stage exploration to end-to-end development and manufacturing.