Our client needed a cooling solution with performance better than that achievable from current cooling tunnel products.
We worked in close collaboration with the client team and with their selected cooling tunnel supplier to enhance a basic tunnel design.
What we did
A combination of analysis, numerical simulation and experimental work helped us create a detailed thermofluidic simulation of the existing tunnel and an enhanced version with significantly improved cooling performance.
The principles of the enhanced design were then implemented by the cooling tunnel supplier with technical oversight by the 42T team.
Results for our client